Quality Control & Certifications
Documents arrive with your order, not after it. Every shipment carries the inspection records that match the parts you bought.
How We Control Quality
Five checkpoints between raw wire and the sealed pallet.
Incoming material
Wire rod is checked for diameter, chemistry and decarburisation before release to production. Heat number recorded.
In-process sampling
First-off and hourly dimensional checks at heading, rolling and forming stations. Out-of-tolerance parts are segregated immediately.
Mechanical testing
Tensile, hardness and proof-load testing per grade. Hydrogen embrittlement baking controlled for plated 10.9 and 12.9 classes.
Coating verification
Plating thickness by XRF and salt-spray testing per coating class. Reports issued by batch and referenced on the packing list.
Pre-shipment inspection
AQL sampling on dimensions, thread gauging, marking and packing. Photos and the report are emailed before we book the container.
Documents You Receive
Included with standard orders; third-party inspection available on request.
EN 10204 3.1 Certificate
Material certificate tied to the heat number, for orders where traceability is a contractual requirement.
Dimensional Report
Measured values against the standard or drawing, with pass/fail per characteristic.
Salt-Spray Report
Hours to red rust for the coating class supplied, tested in our own lab.
Third-Party Inspection
SGS, BV, Intertek or your nominated agent — we book and accommodate the inspection.
Need certificates for a tender or audit?
Tell us which documents your project requires and we will confirm availability before you order.